Fixed Datum Point and Adjusting Machine Steps

Fixed Datum Point and Adjusting Machine Steps

[Abstract]:
Choose a reasonable position to place the tripod (avoid crowds, cars, tuyeres, vibration, glass areas). The height of the tripod is higher than the height of the normal person's safety helmet. General
Fixed Datum Point and Adjusting Machine Steps
1. Choose a reasonable position to place the tripod (avoid crowds, cars, tuyeres, vibration, glass areas). The height of the tripod is higher than the height of the normal person's safety helmet. Generally, the height of the tripod is about 1.8 meters. Look at the bubbles of the level gauge on the tripod must be in the circle.
 
2. After the tripod is supported, turn on the transmitter switch. After normal operation, take the handheld pole (screw on the small receiver) to set the reference point (the general reference point is provided by Party A). Open the small receiver on the handheld pole, loosen the bolt and show "0" to the middle lamp as the reference.
 
3. After the benchmark is set, the machine is adjusted.
 
4. The vibrating plate in front of the machine is cushioned with an object as high as the base plane (e.g. when the ground is hit ten centimeters, the object about ten centimeters is cushioned at both ends of the vibrating plate).
 
5. After padding, start the machine, first lay the "automatic key" to align the fuselage. After aligning, one person is on the machine operating table, one person holds the handheld rod to the left and right scrapers. By pressing the "left and right" push rod key, adjust the two sides of the scrapers to the "0" point, and several times the left and right sides of the scrapers, so as to ensure that they are at the "0" point.
 
6. After adjusting the scraper, start to adjust the two large receivers on the top of the scraper. The large receivers should turn on the green light at both ends. After tightening the bolts, light the big receivers by hand to see if the green light changes.
 
7. After the big receiver corrects the lamp, press the three buttons on the operation panel (left push bar key, front and back balance key of the fuselage, right push bar key) and scramble the upper button. After scrambling, press the "automatic key" to make the machine leveling automatically.
 
8. When the large receivers at both ends keep the green light on, turn off the automatic key and hold the handheld rod against the scrapers at the left and right ends to see the scraper errors at both ends. Errors at both ends within "5" mm can be normally constructed. If more than "5" mm, press (left push rod, front and back balance of fuselage, right push rod) to disturb again, then turn off the automatic, then adjust the scraper error at both ends, usually two or three times.
Note: Choose flat and hard ground adjustment machine.