How to prolong the service life of concrete laser leveler

How to prolong the service life of concrete laser leveler

[Abstract]:
Aolide's laser leveling machine came to explain in detail the necessary measures that should be taken to reasonably extend the service life of the machinery to ensure the normal service life of the co
In the process of construction of a concrete laser leveling machine, timely detection and repair of various faults and defects of the machine is a basic guarantee for the efficient operation of the machine and the extension of its service life. Generally speaking, doing a good job of daily spot checking will improve the production efficiency of the concrete laser leveling machine. It is important to reduce the cost of maintenance.
Aolide's laser leveling machine came to explain in detail the necessary measures that should be taken to reasonably extend the service life of the machinery to ensure the normal service life of the construction machinery and give full play to its due benefits:
1, after the work, please use the arm button to manually lift the nose, and then launch the construction site. It is forbidden to push the machine in contact with the ground in the vibration leveling part to avoid damage to the vibration plate.
2, after the completion of the construction, it is necessary to use high-pressure water guns to flush the machine in a timely manner(it is forbidden for the water gun to directly flush the part of the fuselage mesh to prevent water from entering the interior of the fuselage, causing circuit short circuit and other conditions).
The place where the machine is placed must be kept dry, and there must be no piles of debris and inflammable and explosive goods around.
4. The battery of the machine also needs to pay attention. If it is not used together for a long time, ensure that all batteries are removed from the host and receiver and stored properly. Launcher with rechargeable battery for 8 hours
5. During machine use, please try to recharge the battery power after it is fully used. When charging, try to ensure that it is full for 8 hours at a time. The first charging time is recommended to be 12 hours. After charging, it is advisable to charge for 8 hours. To avoid damaging the battery and transmitter, please remove the power plug in time.
6. If the loss of the laser signal during construction requires the machine to restart, the interval takes more than 10 seconds.
If the machine is placed on a smooth ground for a long period of time, each bearing part should be added once a week, and every chain should often be lubricated to maintain good lubrication. At the same time, care should be taken to avoid sand and other debris from getting into the chain. In case the chain gets damaged too soon. Generally one month or the end of each construction period, the machine should be fully inspected and maintained once. Always pay attention to the degree of tensioning of the triangle belt and chain. When over-loosening, it should be adjusted in time. The fastening bolts should also be frequently priced to prevent loosening.